In autumn 2021, Autolift was commissioned with one of the largest orders in the company’s history. The Italian state railway Trenitalia ordered 45 lifting systems with a total of 348 lifting jacks. 12.5 and 20 tons of lifting jacks are required, both in free moveable and railguided versions. All jacks are equipped with an adjustable load claw and a frequency converter for stepless regulation of the lifting speed. The first 9 systems consisting of 44 lifting jacks with a lifting capacity of 20 tons for the Trenitalia depots in Reggio Calabria, Lecce and Foggia were recently accepted by Trenitalia in the new Autolift plant in Serbia, then delivered, installed and put into operation. Deliveries for the remaining 17 depots will take place over the next few months.